+91-8010060609,+91-9711033176

Thursday 15 January 2015

Bliss Residency NH-58 Ghaziabad


Bliss Infratech Private Limited ( BIPL Group)has been in the housing development sector over the last one decade. The Group has established its reputation as a real estate developer that provides Quality of construction, safety of investment and integrity of commitment.


  The company has so far focused in making quality Residential Plot And Flat on NH-58 Ghaziabad Uttar Pradesh by constructing quality but affordable price and earned a good name in the field of construction. The company is now focusing in Delhi National Capital region (NCR) with development and construction of residential projects.



Residential Plot “Bliss Residency “ also very well connected from National Highway-58 Nordhan Peripheral  Highway & NH-24       
                                           
 National Highway-58:  National Highway 58 is a national highway in India. It links Ghaziabad in Uttar Pradesh near New Delhi with Badrinath and Mana Pass in Uttarakhand near Indo-Tibet border ( 538-Km )


.NORTHERN PERIPHERAL : Northern Peripheral is a part of this plan. It will be an elevated road connecting NH 24 near Dasna to NH 58 and Wazirabad Road in Delhi through Loni


National Highway-24 :National Highway 24 or NH 24 is a National Highway in India that connects the National capital Delhi to Uttar Pradesh state capital Lucknow via. Bareilly running 438 km in length


 Specification :Plot Size- 50,75,100,120 Sq.Yards

Location map Of Project Å¾

The Project is surrounded by big institution Group like R D Engineering College, ITS Dental College, ITI Govt. College & Krishna Institute Of Engineering & TechnologyžMuradnagar Odnance Factory ,Muradnagar Railway Station, Post Office ,SBI Bank and Welfare Indian Gas Agency Muradnagarž Bombay wala Restaurant , Radheshyam Bihar Phase-1 & Mariya Niwas Hospital other Colleges & industries

1- Great  community Earth-quake resistant 2- Road  framed Structure Approved freehold property 3- Designing as per Vaastu Principles 4- 24x7 security System 5-Water supply  6- 1.5 Km Distance of Mono Rapid Metro Rail .7- Only  9 kms. From proposed Metro Station at Meerut  mod 










Wednesday 7 January 2015

Metro Rail In Noida New Okhla Industrial Development Authority Call-09711033176



The Noida, Greater Noida and Yamuna Expressway authorities on Monday have planned forlarge scale infrastructure development across Gautam Budh Nagar district. In a joint board meeting, the major focus of the Authorities remained on providing connectivity within the district as well as with Delhi. "In the next four years, Rs 20,000 crore will be spent on the projects," said Mohinder Singh, chairman of the Authorities.

To begin with, the authorities have approved a major detailed extension of the Metro route connecting almost all of Noida and Greater Noida at a cost of Rs 10,000 crores, covering a total of 86 km. The route is estimated to be ready in the next three years.

Besides extending the existing city centre Metro route connecting Kalindi Kunj and Botanical Garden, a new line from the City Centre station in sector 32 to sector 62, touching NH-24, was also approved. This new 6-km route will be via sector 71 crossing and will provide connectivity to sectors 32, 34, 35, Hoshiarpur, sectors 51, 52, 71, Greater Noida Extension Marg, Sarfabad, sectors 60, 61, 62, 63 and NH 24.

A new loop from sector 71 via sector 121 will then join the Greater Noida route between the City Centre and Bodaki railway station in Greater Noida. This route will be from City Centre along the Greater Noida Expressway, touching Knowledge Park 4 via Pari Chowk and will finally end at Bodaki. The new loop has been added mainly to connect Noida extension that falls near sector 121 with Noida as well as with Greater Noida.

"With the Metro extension, most sectors will be within walking distance from the stations. Connectivity to Greater Noida will also improve tremendously," Singh said.

To smoothen chaotic traffic, the Noida Authority has approved construction of a 5.8 km elevated road parallel to the Shahdara drain. Starting from sectors 14 and 14 A onto sector 95 and Kalindi Kunj, the stretch costing Rs 525 crores will be of four lanes. This route will provide an alternate route between Kalindi Kunj and Noida, thus easing traffic congestion on the expressway.

In the meeting, the Authorities also approved the draft master plan for Greater Noida. As per the 2031 Master Plan, a total of 5,04,000 hectares will be developed. Of this, 27.6 per cent area will be reserved for residential development, while 24.2 per cent will be developed as green area. The approved master plan includes six expressways, overbridges, flyovers, warehouses and godowns, besides several residential, educational, industrial and commercial hubs.




LineStationsLength
(km)
TerminalsNo. of interchanges
planned
     Blue Line branch56Noida City CentreNoida Sector 620










Noida has the Delhi Metro facility till the City Centre from Delhi and also to Vaishali. The Metro service in Noida started in November 12, 2009 (10 months in advance), due to the Commonwealth Games. Metro will further expand in Noida and will also cover Greater Noida.

Noida has three important expressways - DND Flyway, Noida-Greater Noida Expressway and Yamuna Expressway. DND Flyway connects Delhi and Noida in no time and is highly preferred by the office-goers. Yamuna Expressway connects Agra via Mathura to Noida. Recently, a lot of residential developments have been taking place in the Noida-Greater Noida Expressway's adjacent area. The city has access to DTC, UPSRTC and private buses. People can choose auto-rickshaws, cycle rickshaws or taxis for small-distance travel. However, Noida doesn't have direct rail connectivity. The railway stations can be accessed at nearby areas like Anand Vihar and Ghaziabad. 



Delhi Metro Rail Multiple Routes Call- 09711033176


Metro construction under phase 4 may start even before the 140-km phase 3 network is completed. Addressing the valedictory session of the fifth Urban Mobility Conference 2012 on Saturday, Union urban development
minister Kamal Nath said, “If not completely, we would like to start
work on some sections through which we can connect the existing phase 1 and 2 and also the Phase 3 which is under-construction.”
Batting for Delhi Metro's expansion plans, Nath last year had asked Delhi Metro Rail Corporation (DMRC) to prepare the detailed project report for phase 4 so that benefits of phase 1 and phase 2 could be fully reaped.
Nath had assured the Union government's full support to phase 4 and said funds would not be an issue.
“When phase 4 is fully completed, Delhi will have 440 km of metro network, which will be bigger than the London underground,” he said.
Airport metro
The minister spoke about Delhi's Airport Metro Express, which has missed several deadlines for reopening fixed by his department earlier.
“The airport express line might start functioning by the end of this month or early next year, as an inspection by the Commissioner of Metro Rail Safety is expected by then,”
he said.
The minister also said that the proposed monorail will function as a “good feeder to unviable metro projects” by supplementing Metro on certain routes.
http://www.hindustantimes.com/India-news/NewDelhi/Metro-phase-4-work-to-begin-before-phase-3-completion-Minister/Article1-970391.aspx





Monday 29 December 2014

Ajnara Homes Noida Extension Call-09711033176


























Ajnara Ambrosia Sector-118 Noida Call-09711033176